Contact Us! Complete this Form to Get a Quote or Call (888) 233-6471


Gold Partner VAR Contact Form <a href="https://secure.blueoctane.net//forms/C1S4B7QRP2KI">Click Here To Load This Formexperts.com Form</a>

Featured Solution: Cisco High Availability Data


Multiple systems, such as inventory control, credit card processing, accounting and much more will be involved in a complex process such as eCommerce checkout. A failure in one will compromise all the others. A data center is the best environment for these complicated IT functions.

Per-rack power requirements constrain the number of racks a data center can support. A typical 10,000 - 20,000 sq. ft. facility designed for 50 - 100 watts/sq. ft requires 1/2 megawatt to 2 megawatts of power. Availability and cost of utility power in the megawatt range is expensive and difficult to obtain. Supporting infrastructure - generators, ATS, UPS, and distribution equipment - also are costly. Careful planning and growth projections must be maintained to ensure power requirements can be met.

Use server-based energy management software tools to run workloads in the most energy-efficient way. This may include taking advantage of lower energy tariffs at different times.

Operating system virtualization is the use of software to allow a piece of hardware to run multiple operating system images at the same time.

SMBs with an easy on-ramp to virtualizing their applications by automating the installation and configuration of hypervisor VMware.

While virtualization faded from the limelight for a while, it is now one of the hottest trends in the industry again, as organizations aim to increase the utilization, flexibility and cost-effectiveness in a distributed computing environment. VMWare, Citrix, Microsoft, IBM, RedHat and many other vendors offer virtualization solutions.

Data backup can take many forms. After all, any medium on which you save your files apart from your primary computer is considered backup. You might even want to backup your data in more than one location, just in case. If you depend highly upon your computer and upon the files contained therein, you can never be too careful when it comes to protecting your files from disaster.

The Cisco UCS integrates low-latency unified network fabric with enterprise-class, x86-based servers, creating an integrated, scalable, multichassis platform in which all resources participate in a unified management domain. A single system scales to up to 40 chassis, 320 compute nodes, and thousands of virtual machines.

Green IT refers to the study and practice of using computers and IT resources in a more efficient and environmentally responsible way.

The disk drive array may include 12 drives. Each of the first, second and third groups of disk drives may include 4 disk drives. The selected data may be stored on a first disk driveincluded in the first group of disk drives, a second disk drive included in the second group of disk drives and a third and fourth disk drive included in the third group of disk drives. The selected data may include boot code for each of the first andsecond storage processors. The boot code for the first storage processor may be stored on the first disk drive and the third disk drive and the boot code for the second storage processor is stored on the second disk drive and the fourth disk drive.

Next-generation data centers have specific server networking needs, and the Cisco Nexus 5010 one-rack unit (RU) switch provides an Ethernet-based unified fabric that's designed to meet those needs.