Cisco Unified Computing System Shop in Maine, ME:


Androscoggin County Aroostook County Cumberland County Franklin County Hancock County Kennebec County Knox County Lincoln County Oxford County Penobscot County Piscataquis County Sagadahoc County Somerset County Waldo County Washington County York County


About Cisco Data Center Solutions by PBM IT - Call (888) 233-6471.


Cisco Data Center Solutions provided by PBM IT offer the best data storage, data backup, unified computing, green IT, and high-availability data services in Southern California.

Q. What is a building management system (BMS)?
A. In larger data centers, the building management system (BMS) allows for constant and centralized monitoring of the facility, including temperature, humidity, power and cooling.

Per-rack power requirements constrain the number of racks a data center can support. A typical 10,000 - 20,000 sq. ft. facility designed for 50 - 100 watts/sq. ft requires 1/2 megawatt to 2 megawatts of power. Availability and cost of utility power in the megawatt range is expensive and difficult to obtain. Supporting infrastructure - generators, ATS, UPS, and distribution equipment - also are costly. Careful planning and growth projections must be maintained to ensure power requirements can be met.

Removing a single x86 server from a data center will result in savings of more than $400 a year in energy costs alone.

Operating system virtualization is the use of software to allow a piece of hardware to run multiple operating system images at the same time.

Virtualization can be viewed as part of an overall trend in enterprise IT that includes autonomic computing, a scenario in which the IT environment will be able to manage itself based on perceived activity, and utility computing, in which computer processing power is seen as a utility that clients can pay for only as needed.

Hypervisor software is the secret sauce that makes virtualization possible. This software, also known as a virtualization manager, sits between the hardware and the operating system, and decouples the operating system and applications from the hardware. The hypervisor assigns the amount of access that the operating systems and applications have with the processor and other hardware resources, such as memory and disk input/output.

To qualify as a true enterprise solution, a storage management system must be able to scale across the entire enterprise. This means it must be able to handle multiple servers spread across wide geographical areas. The solution should further leverage technologies such as clustering and load balancing to support hundreds or even thousands of client computers. It also must support various network infrastructures and firewall configurations.

With the Cisco UCS M81KR adapter, multiple virtual interfaces (VIFs) can be identified to match those used by the service console, VMware VMkernel, virtual machine data, Cisco Nexus 1000V Series VLANs, etc. as required. Each of these adapters can be defined within the Cisco Unified Computing System as connected to an individual fabric interconnect and, optionally, enabling a failover to the other.

There is growing pressure from environmentalists and, increasingly, the general public for governments to offer green incentives: monetary support for the creation and maintenance of ecologically responsible technologies.

An effective High Availability (HA) data solution must address both unplanned and planned causes of downtime to achieve a truly fault tolerant and resilient IT infrastructure. Unplanned downtime is primarily the result of computer failures, data failures and human error. Planned downtime is primarily due to data changes or system changes that must be applied to the production system.

Next-generation data centers have specific server networking needs, and the Cisco Nexus 5010 one-rack unit (RU) switch provides an Ethernet-based unified fabric that's designed to meet those needs.

Go back